Search results
Results from the Go Local Guru Content Network
In 2003, the LIRR and Metro-North started a pilot program in which passengers traveling within New York City were allowed to buy one-way tickets for $2.50. [63] The special reduced-fare CityTicket, proposed by the New York City Transit Riders Council, [63] was formally introduced in 2004. [64]
The Maryland Transit Administration (MTA) is a state-operated mass transit administration in Maryland, and is part of the Maryland Department of Transportation.The MTA operates a comprehensive transit system throughout the Washington-Baltimore metropolitan area.
In other MTA news, the Post reports that the board is looking to raise fares on LIRR and Metro-North riders, with hikes of 8.19 percent to 9.31 percent. Find out what's happening in Bayside ...
The R262 is a proposed New Technology Train-series subway car for the New York City Subway. It is expected to replace the current R62 and R62A rolling stock, which are used on the subway's A Division and were built in the mid-1980s.
The Myrtle Avenue–Chambers Street Line (later the 10, then the M train) used the Myrtle Viaduct (pictured) along its route between Manhattan and Middle Village. Until 1914, the only service on the Myrtle Avenue Line east of Grand Avenue was a local service between Park Row (via the Brooklyn Bridge) and Middle Village (numbered 11 in 1924). [6]
The MTA plans to pay for about half the plan — $25 billion — with borrowing backed by new revenue streams. About $15 billion of that will stem from congestion pricing, a plan to toll vehicles ...
NYC Subway: trains at 23rd Street. 6th Avenue West 23rd Street: NYC Bus: M7, M55 (northbound only) NYC Subway: trains at 23rd Street PATH: HOB-33, JSQ-33, and JSQ-33 (via HOB) at 23rd Street. Broadway East 23rd Street: NYC Bus: M1, M2, M3, M55 (all buses southbound only) NYC Subway: trains at 23rd Street. Park Avenue South East 23rd Street
The name Metro was suggested by Massimo Vignelli, who designed the signage for the system as well as for the New York City Subway. [28] The 103-mile (166 km), 83-station system was completed with the opening of the Green Line segment to Branch Avenue on January 13, 2001. However, this did not mean the end of the system's growth.