Ad
related to: equipment sign out sheet
Search results
Results from the Go Local Guru Content Network
A PMCS is required before a vehicle can be dispatched and before a piece of equipment, such as a weapon, can be issued. A PMCS sheet, as listed above, for vehicles is called a DA 5988E. This sheet is used to write down any deficiency found during the PMCS procedure.
The checklist places its nineteen items into three "phases" of a surgical procedure: sign-in (before induction of anesthesia, while the patient is still conscious); time-out (with the surgeon present, before skin incision); and sign-out, based on the Joint Commission's Universal Protocol.
Shop drawings are typically required for prefabricated components. Examples of these include: elevators, structural steel, trusses, pre-cast concrete, windows, appliances, cabinets, air handling units, and millwork.
Revisions beyond "Z" start the alphabet over again with doubling, e.g., AA, AB, AC, AD, and so on. In the days of manual drafting, redrawing was expensive, so engineering orders (EOs, ECOs, DCNs, ECNs) were not always incorporated into a next-letter revision. They thus accompany the drawing as part of the TDP.
The submittal process affects cost, quality, schedule, and project success. On large, commercial projects the submittal process can involve thousands of different materials, fabrications and equipment. Commercial buildings will often have complex pre-fabricated components.
A safety data sheet (SDS), material safety data sheet (MSDS), or product safety data sheet (PSDS) is a document that lists information relating to occupational safety and health for the use of various substances and products.
Marking out consists of transferring the dimensions from the plan to the workpiece in preparation for the next step, machining or manufacture. Typical tools include: Surface plate or marking out table — provides a true surface from which to work; Angle plates — assist in holding the workpiece perpendicular to the table
The check sheet is a form (document) used to collect data in real time at the location where the data is generated. The data it captures can be quantitative or qualitative. When the information is quantitative, the check sheet is sometimes called a tally sheet. The check sheet is one of the so-called Seven Basic Tools of Quality Control.
An equipment code describes the communication (COM), navigation (NAV), approach aids and surveillance transponder equipment on board an aircraft. These alphabetic codes are used on FAA and ICAO flight plan forms to aid Flight service station (FSS) personnel in their handling of aircraft.
The use of hazard symbols is often regulated by law and directed by standards organizations. Hazard symbols may appear with different colors, backgrounds, borders, and supplemental information in order to specify the type of hazard and the level of threat (for example, toxicity classes ).