Ad
related to: equipment sign out sheet
Search results
Results from the Go Local Guru Content Network
A safety data sheet (SDS), material safety data sheet (MSDS), or product safety data sheet (PSDS) is a document that lists information relating to occupational safety and health for the use of various substances and products.
A datasheet, data sheet, or spec sheet is a document that summarizes the performance and other characteristics of a product, machine, component (e.g., an electronic component), material, subsystem (e.g., a power supply), or software in sufficient detail that allows a buyer to understand what the product is and a design engineer to understand ...
A PMCS is required before a vehicle can be dispatched and before a piece of equipment, such as a weapon, can be issued. A PMCS sheet, as listed above, for vehicles is called a DA 5988E. This sheet is used to write down any deficiency found during the PMCS procedure.
The checklist places its nineteen items into three "phases" of a surgical procedure: sign-in (before induction of anesthesia, while the patient is still conscious); time-out (with the surgeon present, before skin incision); and sign-out, based on the Joint Commission's Universal Protocol.
Revisions beyond "Z" start the alphabet over again with doubling, e.g., AA, AB, AC, AD, and so on. In the days of manual drafting, redrawing was expensive, so engineering orders (EOs, ECOs, DCNs, ECNs) were not always incorporated into a next-letter revision. They thus accompany the drawing as part of the TDP.
Optical mark recognition ( OMR) collects data from people by identifying markings on a paper. OMR enables the hourly processing of hundreds or even thousands of documents. For instance, students may remember completing quizzes or surveys that required them to use a pencil to fill in bubbles on paper (seen to the right).
The submittal process affects cost, quality, schedule, and project success. On large, commercial projects the submittal process can involve thousands of different materials, fabrications and equipment. Commercial buildings will often have complex pre-fabricated components.
The check sheet is a form (document) used to collect data in real time at the location where the data is generated. The data it captures can be quantitative or qualitative. When the information is quantitative, the check sheet is sometimes called a tally sheet. The check sheet is one of the so-called Seven Basic Tools of Quality Control.
Marking out consists of transferring the dimensions from the plan to the workpiece in preparation for the next step, machining or manufacture. Typical tools include: Surface plate or marking out table — provides a true surface from which to work; Angle plates — assist in holding the workpiece perpendicular to the table
Safety signs are a type of sign designed to warn of hazards, indicate mandatory actions or required use of Personal protective equipment, prohibit actions or objects, identify the location of firefighting or safety equipment, or marking of exit routes.